top of page

Newsroom

Comptek Solutions Launches New Cleanroom to Accelerate Advanced Semiconductor Process Development

  • Writer: Comptek Solutions
    Comptek Solutions
  • Dec 4, 2025
  • 2 min read

Updated: Dec 5, 2025

Featuring unified laser, pilot line, and precision process tools to bridge R&D and industrial-scale semiconductor manufacturing.


View of Comptek Solutions’ new cleanroom from the exterior, showing the pilot line equipment and external chemistry process station from the ISO 5 end
Exterior view of Comptek Solutions’ new ISO cleanroom, showing the pilot line & external chemistry process station

TURKU, Finland — 4 December 2025 — Comptek Solutions, a pioneer in passivation and surface engineering for compound semiconductors, has completed a major infrastructure expansion with the opening of new cleanroom facilities at its premises in Turku, featuring ISO 5, ISO 6 and ISO 7 environments.


The new cleanroom strengthens Comptek’s ability to deliver advanced surface processing, pilot-scale integration, and optical characterization offerings to semiconductor manufacturers and research partners worldwide.


“Our new cleanroom environment significantly enhances both the precision and throughput of our process development work,” said Mr. Vicente Calvo Alonso, CEO and Co-Founder of Comptek Solutions. “It allows us to integrate our proprietary KontroxTM passivation technology into industrial workflows while expanding our in-house measurement and fabrication capabilities.”

 

Integrated Laser, Pilot Line & Process Tools

The new cleanroom hosts Comptek’s core laser processing systems, including KontroxTM LASE 16 Industrial and KontroxTM LASE 16 R&D Platform for precision treatment of edge-emitting laser facets.


In particular, the ISO 5 cleanroom supports high-precision optical metrology, lithography, and chemistry-based processes, featuring:

  • Optical microscope and ellipsometer for ALD oxide thickness measurement

  • ALD oxide growth tool and lithography equipment

  • Load lock and glove box connected to the EIC-funded, ALD-integrated pilot line, enabling advanced passivation of substrates up to 200 mm using Comptek’s proprietary KontroxTM nanoengineering technique 

This unified setup allows flexible sample loading and seamless transition between process development, pilot-scale operation, and in-line characterization under one roof.


Continued Growth and Industry Momentum

This expansion marks the latest milestone in Comptek’s ongoing facility upgrades since its founding in 2017 and reflects the company’s steady growth alongside rising global demand for advanced passivation technologies in semiconductor manufacturing.


With multiple projects underway across lasers, photonics, power electronics and other applications, the company's new cleanroom capacity is already fully engaged, providing the foundation to deliver consistent, industrial-grade results to both research partners and industrial customers.


Advancing Toward Industrial Integration

Comptek’s progress has been made possible through strong support from investors and partners, including the EIC-funded pilot line project, which has played a key role in enabling this infrastructure boost.


“The realization of this milestone is a testament to our team’s perseverance, dedication, and collaborative spirit,” continued Alonso.


“From early-stage research to industrial systems and pilot lines, our team have consistently delivered breakthroughs that are now being translated into tangible, scalable technologies. These facilities represent a major step toward bridging R&D and industrial manufacturing. Our goal is to provide customers not only with state-of-the-art passivation processes but also with complete tools and know-how to characterize and optimize their materials and devices.”

 

The expansion underscores Comptek’s long-term commitment to supporting the rapidly evolving compound semiconductor industry worldwide — particularly for photonics, power electronics, and next-generation optoelectronic devices.


Exterior view from the ISO 5 end of Comptek Solutions’ cleanroom expansion, showing the pilot line and seamless workflow connectivity among pilot line and ISO 5 processing facilities.
Exterior view of Comptek Solutions' ISO 5 cleanroom, showing pilot line workflow connectivity

Visit our Cleanroom & Equipment Capabilities section to explore our new infrastructure and full equipment portfolio in detail.


 Click here to download the full press release (PDF)


bottom of page